Concalpro Civil Works

Hacienda La Lagunita Vista Real

Development: Residential Complex Lagunita Vista Real
Project: Earthwork (140,000.00 m3), construction of containment element (5,000.00 m3) and widening of the existing road (20,000.00 m3).
Location: La Unión Highway, El Hatillo Municipality, Miranda State, Venezuela.
Description: Deforestation, removal of the waste land, earth bank, compacted fill and waste material canister for the construction of the terraces corresponding to the urbanism of the residential complex, construction of fill with soil cement material and rockfill as a containment element of the compacted fill and construction of the extension of the existing road with the use of fill reinforced with geogrids.
Period: 2006
Value of the work: US$ 945,000.00


Urbanismo La Escondida

Development: Urbanismo La Escondida
Project: Urban works in La Escondida Development.
Location: Av. Principal de La Tahona, Urbanización La Tahona, Municipality of Baruta, Miranda State, Venezuela.
Owner: Asociación Civil Propietarios Terrenos La Escondida / Propietarios Terrenos La Escondida Civil Association.
Description: 13,420.00 m3 of cut and compacted fill; 3,785.00 m2 of retaining structures, 2,500.00 m2 of roadway with concrete pavement, construction of aqueduct, sewer and drainage system.
Period: 2003 – 2005
Project Value: US$ 2,130,000.00


Colinas de La Tahona

Development: Colinas de La Tahona
Project: Earthwork and construction of access road with concrete pavement in the Colinas de La Tahona Urban Development.
Location: Between the urbanizations of La Tahona and Los Naranjos, Municipality of Baruta, Miranda State, Venezuela.
Owner: CAYCO Group
Description: Earthwork (265,000.00 m3) in rough topography that includes the removal of topsoil, excavation (cutting) and compacted fill for the construction of more than 300,000.00 m2 of multi-family plots and the construction of access road with concrete pavement of 8,000 m2 (80,000.00 Sqf.).
Period: 1998 – 1999
Value of the work: US$ 2.115.000,000,00


Paseo El Hatillo Shopping Mall

Development: Paseo El Hatillo Shopping Mall
Project: Excavation, loading and unloading of any type of material for the construction of the Paseo El Hatillo Shopping Center.
Location: Urbanization La Lagunita Country Club, Municipality El Hatillo, Miranda State, Venezuela.
Owner: La Lagunita, S.A.
Description: Earthwork (225,000.00 m3) in depression that includes the excavation, loading and dumping of any type of material for the construction of the basements of the Paseo El Hatillo Shopping Center.
Period: 2001 – 2003
Value of the work: US$ 1,235,000.00


Construction of the oil platform of the DJ2X Well in the Jusepín field.

Project: Construction of the oil platform of Well DJ2X Jusepín Field.
Location: Jusepín, Monagas State, Venezuela.
Description: Earthwork for land leveling, excavation for the construction of mud pits (10 m. x 10 m.), contaminated water (20 m. x 20 m.) and clean water (20 m. x 20 m.), construction of a 10 cm. thick concrete lining in the mud and contaminated water pits, construction of a geoimper type geotextile blanket lining in the clean water pit, construction of the cellar for the placement of the drill hole.

Owner: Total Oil and Gas

Executed: May 1997
Project value: US$ 340,000.00



Construction of Caucagua Distributor, Troncal 009, Miranda State

Project: Construction of Caucagua Distributor, Trunk 009, Miranda State
Location: Caucagua, Miranda State, Venezuela
Description: Earthwork, drainage, construction of granular base, paving, construction of reinforced earth wall and construction of a 25 m. long bridge.
Owner: Instituto de Vialidad y Transporte del Estado Miranda (Miranda State Highway and Transportation Institute).
Period: 1997 – 1998
Job value: US$ 1,419,000.00
Participation: Strategic Alliance with MIXER, C.A. (CONCALPRO 50%)


Culmination of the construction of El Diluvio Dam

Project: Culmination of the construction of El Diluvio dam.
Location: Jesús Enrique Lossada Municipality, Zulia State, Venezuela.
Description: Earthwork for dam construction, construction of rock filters, construction of screens for slope protection and construction of spillway.
Owner: Ministry of Environment and Natural Resources.
Period: 2004 – 2006
Project value: US$ 34,941,860.00
Participation: Strategic Alliance with INGENIERÍA SERUR, C.A. (CONCALPRO 25%)


Public sector Works

WORK

DATE

Amount US$

General José Antonio Paez” Highway, Guanare-Rio Avispero Distributor Section Earthwork and minor drainage works.09/09/1991950,539.08
Construction of urbanism for INAVI housing, Yaritagua (INAVI).21/08/1992711,535.62
General José Antonio Paez” Highway, Section Distrib. Sabaneta-Distrib. Guanare, Prog. 35+300 to 59+040 Origin Barinas, Construction of bridge over the Tucupido River.23/06/1993476,745.11
Land leveling, construction of lagoons and roads, minor civil works.18/12/1992605,229.85
General José Antonio Paez” Highway, Section Distrib. Sabaneta-Distrib. Guanare, Prog. 35+300 to 59+040 Origin Barinas, Construction of reinforced earth bridges.23/06/1993521,559.09
Undermining of 26″ Aguasay Gas Pipeline, Aguasay, Monagas State (CORPOVEN).04/03/1996413,793.10
Rehabilitation of location DJ-2X Jusepín (TOTAL OIL and GAS VENEZUELA).10/01/1997206,299.81
Construction of locations FUL-S24, W12, INY-G3 El Furrial (LAGOVEN)07/08/1997423,472.47
Construction of the new bridge over the Aragua River, Via Orocual, Maturín. (LAGOVEN)16/09/1997516,159.75
Construction of sub-station José, earthwork, José (EDELCA).23/01/19972,476,836.07
Rehabilitation of forest roads in the south of the states of Monagas and Anzoátegui. (CVG + PROFORCA)22/04/19982,136,817.24
Expansion of Boquerón Project Plant, Phase 1, Maturín. (ARCO)26/07/219994,848,337.87
Construction of drilling platform in location DJ-X/DJ-Y, Jusepín.09/01/2002543,023.32
Earthwork for the construction of “El Tigrito” sanitary landfill, Guacara.24/03/2003375,136.46
Earthwork, Buena Vista urbanism, Aragua de Maturín, Piar.23/07/2004781,250.00
Construction of locations in the northern district, Year 2004, Group B.08/09/20041.496,244.875